Industrial License Dubai

What Is an Industrial License in Dubai?

An industrial license in Dubai is mandatory for businesses that transform raw materials into finished goods. Manufacturing, assembly, processing, fabrication, and packaging all require this license.

The DET issues this license for mainland factories. Free zone authorities such as JAFZA, Dubai Industrial City, and Dubai South issue it within their zones. A physical production facility is mandatory.

Beyond the local license, manufacturers must also register with MoIAT for the federal Industrial Production Certificate. This unlocks 5% customs duty exemption on imported machinery and raw materials.

License Scale

Types of Industrial License in Dubai

Light Industrial License

  • Low equipment intensity and minimal hazard risk
  • Light assembly, simple packaging, small workshops
  • Fewer authority clearances than medium or heavy
  • Suited to SME manufacturers entering the market
  • Lower capital requirements and faster approvals
  • Available in most Dubai industrial zones

Medium Industrial License

  • Mid-sized factories with significant machinery
  • Food processing, textiles, metal fabrication
  • Requires safety and zoning compliance checks
  • Civil Defence and Municipality clearances needed
  • HACCP required for food production operations
  • Most common category for growing manufacturers

Heavy Industrial License

  • Large-scale production with hazardous materials
  • Chemical plants, foundries, pharma production
  • Highest capital and documentation requirements
  • Environmental permits and MOCCAE clearance needed
  • Chemical safety data sheets and insurance mandatory
  • Typically restricted to JAFZA or approved mainland zones
Industrial Zones

Which Industrial Zone Is Right for Your Factory?

01
Jebel Ali Free Zone

JAFZA — Jebel Ali Free Zone

Adjacent to Jebel Ali Port. Suited to heavy industrial and large-scale manufacturing with hazardous goods handling.

02
Dubai Industrial City

Dubai Industrial City

Purpose-built for light to medium manufacturing with fitted factory units and SME packages near Al Maktoum Airport.

03
Dubai South

Dubai South Free Zone

Co-located with Al Maktoum Airport. Suited to aerospace-adjacent and air freight-dependent light manufacturing.

04
DET Mainland

Mainland Industrial Zone (DET)

Full UAE market access and government contract eligibility. Factory must be in an approved zone with an Ejari lease.

05
Municipality Zones

Municipality Industrial Areas

Al Quoz and Ras Al Khor are established mainland districts for lighter manufacturing with strong road access.

06
Sector Clusters

Sector-Specific Clusters

Dubai Science Park for pharma, Dubai Healthcare City for medical devices, Dubai Textile City for garment production.

Setup Process

How to Get an Industrial License in Dubai

A structured process from facility planning to first production run typically 10 to 15 working days for the license, up to 3 months with full approvals.

Week 1

Define Activity and Choose Zone

Fix your activity and scale. Choose mainland or free zone, then pick the zone that fits your logistics model.

Week 1

Reserve Name and Get Initial Approval

Submit your trade name and plan to DET or free zone. Confirms your activity before committing to any facility.

Week 2

Secure Factory and Prepare Blueprint

Lease in an approved zone. Prepare a blueprint: machinery, workflow, ventilation, drainage, and fire safety.

Week 2–4

Obtain Multi-Authority Clearances

Run Civil Defence, Municipality, and DEWA clearances in parallel. Food or chemical approvals run concurrently.

Week 3–5

Submit Application and Receive License

File your full application with all clearances and fees. License issued after verification by the authority.

After License

Apply for MoIAT Production Certificate

Apply on moiat.gov.ae. Requires AED 250,000 capital and 10 employees. Unlocks 5% duty exemption on machinery.

Required Documents

Documents Required for an Industrial License in Dubai

An industrial license requires more documentation than a commercial or professional license. You are dealing with multiple government authorities simultaneously. Having the right documents ready from the start is the difference between a 15-day process and a 3-month one.

Core Documents for All Industrial Applicants

  • Passport copies of all shareholders and directors
  • Memorandum of Association, drafted and notarized
  • Business plan with production scale and projections
  • Factory blueprint showing machinery and workflow layout
  • Equipment list with technical specifications
  • Ejari-registered factory or warehouse lease contract
  • Trade name reservation certificate from DET or free zone
  • Initial approval certificate from DET or free zone

Sector-Specific and Authority Approvals

  • Civil Defence: fire safety and emergency system approval
  • Dubai Municipality: environmental and health clearance
  • DEWA: utility connection and capacity confirmation
  • Food production: HACCP certification and hygiene plan
  • Pharma manufacturing: MoHAP facility approval needed
  • Chemical production: MOCCAE environmental permit

Requirements vary by production type, facility size, and jurisdiction. Sector-specific approvals must run in parallel with the main license application to avoid adding months to your timeline. Riz and Mona Consultancy coordinates all multi-authority submissions as part of your industrial license setup.

Cost Guide

Industrial License Cost in Dubai

Industrial setup costs are higher than commercial or professional licenses because of facility requirements, multi-authority compliance, and equipment investment. These figures reflect license and compliance costs only to machinery and fit-out are additional.

Light Industrial — Mainland or Free Zone

AED 20,000 – 35,000

Covers DET or free zone license fees, trade name, MOA, initial authority clearances (Civil Defence, Municipality, DEWA), and facility lease registration. Machinery, fit-out, and visa costs are additional.

Medium Industrial — Mainland LLC

AED 30,000 – 55,000

Includes all light industrial costs plus higher DET activity fees, sector compliance approvals such as HACCP for food, additional Municipality inspections, and MoIAT registration fees. Production equipment is separate.

Heavy Industrial — Specialist Zones

AED 50,000 – 100,000+

Covers JAFZA or equivalent zone fees, MOCCAE environmental permits, chemical safety documentation, hazardous storage licensing, insurance, and comprehensive technical compliance submissions.

What Drives Industrial Setup Costs Higher

  • Facility size and zone location

    Industrial facilities in JAFZA or Dubai Industrial City carry higher lease rates than municipality zones. Larger facilities are required for heavy production, and market fees on the mainland are calculated on total lease value.

  • Number and complexity of authority approvals

    Every external clearance to Civil Defence, Municipality, DEWA, MOCCAE to carries its own fee and inspection cost. Regulated sectors like food, pharma, and chemicals add further approvals, each with their own timeline.

  • MoIAT registration and inspection

    The Industrial Production Certificate application fee and inspector visit are separate from the local license cost, but the customs duty exemption it unlocks typically recovers this cost many times over for capital-intensive factories.

  • Machinery and production equipment

    Machinery import duties (5% standard rate) apply before the MoIAT exemption is secured. Large equipment investments should be timed after the MoIAT certificate is issued to capture the full customs duty saving.

  • Staff visa quota and worker accommodation

    Industrial operations require larger teams than service businesses. MoIAT registration itself requires a minimum of 10 employees. Worker accommodation costs are a significant factor in zones like Dubai Industrial City.

Pricing Disclaimer

All figures are indicative. Final costs depend on production type, facility size, zone, number of authority approvals, and visa requirements. Riz and Mona provides a full itemized quote for your specific industrial setup.

Visa Eligibility

What Visas Does an Industrial License Unlock?

An industrial license opens visa eligibility for the owner and full production team. Manufacturing operations typically require more visas than any other license type.

Once your license is active, you can apply for an investor residency visa as the company owner. This gives you UAE residency, an Emirates ID, and the right to open personal and corporate bank accounts.

Mainland industrial companies have no fixed employee visa cap. Your quota grows with facility footprint. MoIAT requires a minimum of 10 employees, so visa planning must start alongside the license application.

Riz and Mona handles investor and employee visas as part of the industrial setup so your production team is in place alongside your first operational approval.

  • Investor / Partner Visa, 2 to 3 years
  • Employee Visa, no cap on mainland
  • Dependent Visa, spouse, children, parents
  • Green Visa, 5-year self-sponsored
  • Golden Visa, 10-year for eligible investors

Visa Notice

Health insurance is mandatory for all UAE visa holders. MoIAT requires minimum 10 employees. Visa costs are billed separately from the license fee.

Banking

Opening a Corporate Bank Account for Your Factory

Industrial companies are among the most documentation-intensive banking applications. Banks want to understand your production model, raw material supply chain, capital investment in machinery, and customer base.

Banks and Processing Times

Banks That Work With Industrial Companies

Emirates NBDIndustrial and Trade Finance
HSBC UAEInternational Manufacturing
Mashreq BankCapital Equipment Financing
First Abu Dhabi BankLarge-Scale Industry
Commercial Bank of DubaiSME Manufacturing
RAKBankLight Industrial Startups

Typical Approval Timelines

Mainland Industrial Company3 to 6 weeks
Free Zone Industrial Company2 to 4 weeks
Digital or Fintech Banks5 to 10 days
  • Banks will ask about your machinery financing plan and capital source. Come prepared with evidence of your investment, not just your license documents.
  • Import of raw materials and export of finished goods create complex transaction patterns. Banks want to understand the full production and trade cycle before opening an account.
  • If you are importing heavy machinery before the MoIAT certificate is confirmed, the 5% customs duty will apply. Time your equipment purchases to capture the exemption.
  • Riz and Mona Consultancy prepares your full industrial banking KYC package and introduces you to banks with experience in manufacturing client profiles.
Avoid These Mistakes

Common Mistakes in Industrial License Setup

Industrial setup is the most complex license process in Dubai. These are the mistakes that cause the most expensive delays to and every one of them is avoidable.

Signing Lease Before Initial Approval

Committing to a factory before approval is confirmed is costly. If restricted in that zone, you are locked into an unusable lease.

Running Approvals Sequentially

Civil Defence, Municipality, and DEWA clearances must run in parallel. Sequential handling adds months to your timeline for no reason.

Skipping MoIAT Registration

Without the Industrial Production Certificate, you pay 5% duty on every machinery import. For capital-intensive factories, not optional.

Importing Machinery Too Early

Bringing in capital equipment before MoIAT approval means paying full customs duty. For expensive production lines, this is avoidable.

Underestimating the Timeline

A full industrial setup with sector approvals takes 1 to 3 months. Building the right timeline into your plan prevents cash flow pressure.

Incomplete Factory Blueprint

Thin layout plans are a common cause of authority rejection. The blueprint must cover machinery, ventilation, drainage, and fire safety.

Get Started

Ready to Set Up Your Factory in Dubai?

Whether you are building a food processing unit, a fabrication workshop, a pharma line, or a large industrial facility, Riz and Mona manages every step from zone selection to production.

WhatsApp UsCall Now
Free initial consultationLicense and approvalsMoIAT registration supportAnnual renewal management
All costs are indicative. A personalized quote is given after your consultation based on production type and facility.