Industrial Licence
The core ICAD licence for manufacturing, processing and assembly. Tied to a land plot in your cluster.

ICAD is Abu Dhabi's flagship industrial free zone in Musaffah, now under KEZAD. Its five clusters group industries by type, from heavy metals to high-tech, with 100% ownership.

ICAD is the Industrial City of Abu Dhabi, the emirate's largest purpose-built industrial free zone. It sits in Musaffah, about 20 km from Abu Dhabi city on the E11. It spans 40 square kilometres and hosts 355+ companies.
ICAD was built by ZonesCorp, founded in 2004. Since the 2022 merger that formed KEZAD Group, ICAD now sits under the KEZAD umbrella, run under AD Ports Group. It remains an official Abu Dhabi free zone under ADDED.
What makes ICAD different is its structure. It is split into five clusters, ICAD I to V, each built for a type of industry. Choosing the right cluster is the first real decision, and it shapes your plot, neighbours and utilities.
ICAD earns its place for one type of founder: the manufacturer who needs an industry-matched plot, utilities and neighbours. Here is what you get.
ICAD is built for industrial production, not services or trade alone. Its value is the five clusters that match your plot to your industry. That fits manufacturers well and suits few others. We tell you which cluster before you commit.
ICAD issues activity-specific licences, so your cluster and plot follow what you make. Riz & Mona confirms the right cluster and the full facility cost before you apply.
Every ICAD company formation gives you the licence, plot and access you need to build, manufacture, hire and ship from day one.
Your ICAD licence covering the specific manufacturing or industrial activity you select. Renewable each year.
Legal proof your company exists inside ICAD. Banks, clients and immigration all ask for it.
A land plot in the cluster built for your sector, sized to your operation and agreed with the authority.
A Musaffah industrial address used for banking, contracts and official filings.
Your company's registration with UAE immigration. Needed before any visa.
Sponsor UAE residence visas, with quotas linked to your plot and facility.
No duty on machinery, raw materials and semi-finished production inputs.
Sell on the Abu Dhabi mainland without a separate company, through ADDED.
Introductions to UAE banks that work with industrial firms.
ICAD is built around industrial licences across seven sectors, with a staged path from a preliminary to a permanent licence as you build.
The core ICAD licence for manufacturing, processing and assembly. Tied to a land plot in your cluster.
The first-stage licence that lets you start building your facility and connect utilities during construction.
The full licence to trade and manufacture, issued once your facility is built and ready to run.
An ADDED add-on that lets your free zone company also operate on the Abu Dhabi mainland.
ICAD licences are activity-specific and staged as you build. Riz & Mona confirms the exact activity, cluster and licence path before you apply.
ICAD runs on land, not packages. The main cost is the annual lease on your plot, plus a service charge and a licence fee. Land rates are published, but licence fees are quote-only. Treat every figure as indicative.
About AED 20 to 25 per m² per year
The core cost, set by ZonesCorp by cluster and plot. A service charge of AED 3 per m² is added on top.
Quoted by the authority
Licence and one-time registration fees are not published and vary by activity and structure.
Your capital project
Construction, power and water for your facility, on top of the land lease. Priced by your build.
This is the big one. Your land lease runs on square metres, so plot size drives the largest recurring cost.
Rates vary by cluster and plot within the AED 20 to 25 band, based on location and characteristics.
An industrial licence with approvals costs more than a simple one. Fees are set by the authority per activity.
Priority mainland manufacturers may access reduced ILRP land rates. Free zone entities are not eligible for that programme.
Construction, utilities and visa packages are on top of the lease and scale with your operation.
All costs shown are indicative. Land rates come from published ZonesCorp data and move by cluster and plot, while licence and registration fees are quoted by the authority per activity, so the only accurate number is a tailored quote. Note the reduced ILRP land rates apply to eligible mainland manufacturers, not free zone entities. Riz & Mona provides a personalised quote at no charge before you commit.
Plot access comes in about two weeks after approval, but building your facility takes longer. Here is the journey.
Be specific about what you will make. ICAD licences are activity-specific and set your cluster and plot.
Select an FZE, an FZC or a branch, based on owners and your plans.
Submit your company name for approval against UAE naming rules.
The authority approves your activity and allocates a land plot in the right cluster.
Oil, gas, chemicals and food activities need ministry approvals before you proceed.
Access your plot and sign the pre-lease, then apply for the preliminary licence to build.
Construct your facility, then upgrade to the permanent licence to start operations.
Having your file ready before you apply is what keeps your approval and plot allocation on track.
The list is heavier than a standard free zone because ICAD assesses your industrial project. Alongside the individual documents, expect a business plan, a CV showing sector experience, and a bank reference.
Documents issued outside the UAE need attestation and translation before submission. Requirements shift by structure, activity and cluster. Riz & Mona confirms your exact checklist before you prepare anything.
Attested certificate of incorporation, MOA of the parent, a board resolution approving the setup, power of attorney for the signatory, and passport copies of all directors.
Full process
Working days
From entry permit to Emirates ID in hand, a standard visa runs about three to five weeks once your establishment card is live.
Visa notice Visa approvals and conditions are set by UAE immigration authorities and can change without notice. Riz & Mona Consultancy handles the full process on your behalf, from establishment card to Emirates ID collection. Only the medical test and biometrics need your presence in the UAE.
Your ICAD licence lets your company sponsor UAE residence visas. The quota is linked to your plot size and facility. Because ICAD plots are large, manufacturing operations can sponsor a substantial factory workforce.
UAE banks run close checks before opening any account. Industrial firms with import and export flows get questions on suppliers, buyers and cash flow. A clear ICAD activity and plot give your file a solid base. Each bank decides on its own.
ICAD groups industries into five clusters so your plot sits among compatible neighbours, shared utilities and the right infrastructure.
Abu Dhabi has several official free zones, each built for a sector. The real question is ICAD versus the zones a manufacturer would actually weigh. Here is that comparison.
Not sure which Abu Dhabi zone fits?
Every operation weighs sector, facility and cost differently. Riz & Mona compares zones against your activity, your markets and your budget, then recommends one.
From cluster selection to land plot to bank account, Riz & Mona sets up your ICAD company end to end, so you get an Abu Dhabi manufacturing base built on the right numbers.